Please Log in/Register to turn notification preferences on/off for this case.
 Development
 Wind Farm (Generating station of >100 <200 MW Capacity)
 Chleansaid Wind Farm
 Consented
 ECU00002031
  Highland Council
 Adam Paterson
 RSK Environment Ltd
 65 Sussex Street, Glasgow, G41 1DX
 apaterson@rsk.co.uk
 Matthew Braund
 ESB ASSET DEVELOPMENT UK LIMITED
 Tricor Suite, 4th Floor, 50 Mark Lane , London , UK , EC3R 7QR
 01415594881
 matthew.braund@esb.ie
 662367
 A proposed wind farm comprising sixteen onshore wind turbines, twelve with a maximum tip height of 200m and four with a maximum tip height of 180 m, with a generating capacity of approximately 96 megawatts and battery energy storage system of approximately 20 megawatts.
 30 Mar 2022
 15 Dec 2023
 Consented
 116
 200
 16