Please Log in/Register to turn notification preferences on/off for this case.
 Scoping
 Wind Farm (Generating station of >50 < 100 MW Capacity )
 Knockkippen Wind Farm
 Pre Application
 ECU00003322
  East Ayrshire Council
 Sarah Miller
 Land Use Consultants
 Sarah.Miller@landuse.co.uk
 Tim Mockridge
 Naturalis Energy Developments Ltd
 2nd Floor, 75-77 Margaret Street, London, W1W 8SY
 tim.mockridge@regpower.co.uk
 The construction and operation of a new wind farm (Knockkippen Wind Farm) comprising up to 12 turbines, a 33kV switching station and other ancillary items including provision for a control building, a battery storage facility, and solar panels. The 12 turbines proposed will have maximum tip height of up to 180m.
 12 Aug 2021
 180
 12