 Development
 Wind Farm (Generating station of >50 < 100 MW Capacity )
 Hopsrig Wind Farm
 Consideration
 ECU00002160
  Dumfries and Galloway Council
 Stewart Robson
 WSP
 7 Lochside View, Edinburgh Park, Edinburgh, Midlothian, EH12 9DH
 +44 131 344 2300
 stewart.robson@wsp.com
 Mike Molleson
 Muirhall Energy Limited
 Muirhall Farm, Auchengray, Carnwath, ML11 8LL
 mm@muirhallenergy.co.uk
 Wind farm with generating capacity of 85.8MW and battery storage capacity of 14.1MW located west of the B709,approximately 7.5km northwest of Langholm and 15km northeast of Lockerbie in the Planning Authority area of Dumfries and Galloway. Consists of 13 turbines with a maximum blade tip height of 200m. Also ancillary infrastructure including access tracks connecting infrastructure, a small expansion of the existing vehicular access point from the public highway, hard standing areas e.g. crane pads, potential borrow pit(s), at least one anemometer mast, temporary working areas e.g. construction compound, control building and substation, and electrical cabling between this and the turbines.
 10 Nov 2021