Wind Farm (Generating station of >50 < 100 MW Capacity )
Forsinain Forest Wind Farm
5063 / LCW002
Electricity generating station comprising up to 12 wind turbines (2 turbines up to 206 m and 10 turbines up to 219 m blade tip height) with associated infrastructure, including turbine foundations, crane hardstandings, access tracks (new and upgraded), up to two access points from the A897, one substation compound hosting transmission infrastructure, substation and control building, underground cabling, one temporary construction compound, a temporary concrete batching plant and one anemometer mast.
27 Aug 2026