Hybrid Renewables (Other Generating Station)
Springfield Solar Farm & Battery Energy Storage System (BESS)
0733745
The Proposed Development is to construct, install, operate and decommission a ground-mounted solar photovoltaic (PV) development with a generating capacity of up to approximately 165 Megawatts (MW), Battery Energy Storage System (BESS) with a capacity of up to approximately 80 MW, associated infrastructure, access, and landscaping for an operational period of up to 40 years. The Proposed Development is to be located approximately 7.8 km southeast of Dunbar.
06 Jun 2025