Please Log in/Register to turn notification preferences on/off for this case.
 Development
 Wind Farm (Generating station of >50 < 100 MW Capacity )
 Appin Wind Farm
 Application
 ECU00003447
  Dumfries and Galloway Council
 Land Use Consultants (LUC)
 Land Use Consultants
 projects@landuse.co.uk
 Rebecca Todd
 Appin Wind Farm Limited
 22 Bishopsgate, London, EC2N 4BQ
 Rebecca.todd@statkraft.com
 Generating station consisting of the construction and 50-year operation of up to 9 wind turbines (each with a maximum blade tip height of 200m) and associated infrastructure. The wind farm is expected to have an installed capacity of approximately 64.8MW, and will be located approximately 9km northwest of Moniaive.
 12 Jun 2025
 64.80
 200
 9