Wind Farm (Generating station of >50 < 100 MW Capacity )
Appin Wind Farm
ECU00003447
Dumfries and Galloway Council
Land Use Consultants (LUC)
Land Use Consultants
projects@landuse.co.uk
Rebecca Todd
Appin Wind Farm Limited
22 Bishopsgate, London, EC2N 4BQ
Rebecca.todd@statkraft.com
Generating station consisting of the construction and 50-year operation of up to 9 wind turbines (each with a maximum blade tip height of 200m) and associated infrastructure. The wind farm is expected to have an installed capacity of approximately 64.8MW, and will be located approximately 9km northwest of Moniaive.
12 Jun 2025
64.80
9