Development
 Overhead Power Line (EIA)
 132kV Overhead Line from Glendye Wind Farm to Fetteresso substation
 Consideration
 ECU00005197
 Aberdeenshire Council
 Leona Graves
 Scottish Hydro Electric Transmission Plc
 100 Dunkeld Road, Perth, PH1 3AQ
 Leona.Graves@sse.com
 ECU00005197
 We proposal to construct a new Overhead Line (OHL) to connect the consented Glendye Wind Farm to the National Grid. The proposal is a single circuit 132 kV steel trident pole arrangement, supporting the OHL running over a distance of approximately 20 kilometres in length from the on-site substation at the consented Glendye Wind Farm to the existing Fetteresso substation, in Aberdeenshire
 10 Oct 2025
 20
 132
 13