 Development
 Overhead Power Line (EIA)
 Strathy Wood Wind Farm Grid Connection
 Consultation
 ECU00005221
  Highland Council
 James Harris
 Scottish Hydro Electric Transmission Plc
 10 Henderson Road, Inverness, IV1 1SN
 07969688976
 James.JH.Harris@sse.com
 LT559
 The Proposed Development is part of a wider approach to rationalise and facilitate five wind farm connections in the area, referred to as the Connagill Cluster Grid Connections. The Proposed Development would eventually share the OHL connection with the consented Strathy South wind farm. The Strathy South grid connection would connect the consented Strathy South wind farm substation to the Strathy Wood wind farm substation via underground cable. From there both Strathy Wood wind farm and Strathy South wind farm connections would share the OHL infrastructure proposed as part of the Proposed Development. Due to the combined generating capacity of the consented Strathy South and Strathy Wood wind farms the shared connection would be unable to utilise the existing Strathy North trident H wood pole 132 kV OHL to Connagill substation. Instead a new section of double circuit 132 kV OHL supported by steel lattice towers would continue the connection between the Strathy North T at Dallangwell to Connagill.
 05 Dec 2024
 4500
 132
 28