Wind energy development comprising the construction, 25 year operation and subsequent decommissioning of up to 19 turbines; together with on-site access tracks, hard-standing areas, temporary borrow workings, a substation, battery energy storage and control building compound, operational anemometry mast, on-site underground cabling and a temporary construction compound.
Amended to 17 turbines by the provision of additional information comprising 15 with a tip height of 149.9m and 2 with a tip height of 125m.
17 Dec 2018