Overhead Power Line (Non-EIA)
ZV Route 400kV OHL Diversion
ECU00005071
South Lanarkshire Council
Thomas Dodsworth
SP Transmission Plc
Land and Planning, 55 Fullarton Drive, Glasgow, G32 8FA
07385 004684
tdodsworth@spenergynetworks.co.uk
The Proposed Development is located wholly within the administrative boundary of South Lanarkshire Council. The Proposed Development will comprise:
Upgrades to the foundations of two existing ZV route towers (ZV108 and ZV111) and (if detailed design requires) an upgrade of the tower arms of both ZV108 and ZV111 at the existing locations with removal of old and installation of new associated conductors);
Removal of two existing ZV route towers (ZV109 and ZV110) and associated conductors.
Installation of three new towers at ZV109R, ZV110A, ZV110B and associated conductors and foundation works; and
Approximately 90 m downleads to Gantry structures within the Redshaw substation
30 Aug 2024
08 Jul 2025
Non-EIA
1100