Development
 Wind Farm (EIA)
 Sheirdrim Renewable Energy Development
 Refused
 ECU00001957
 Argyll and Bute Council
 Michael Fenny
 SLR Consulting
 The Tun, 4 Jacksons Entry, Edinburgh, EH8 8PJ
 mfenny@slrconsulting.com
 Fiona Lindsay
 ScottishPower Renewables (UK) Ltd
 The Soloist, 1 Lanyon Place, Belfast, BT1 3LP
 405.00481.00051
 The proposed Development comprises 19 three-bladed horizontal axis wind turbines, 16 up to 149.9 m tip height and 3 up to 135 m tip height, with a combined rated output of around 114 megawatts (MW) and around 20 MW of ground mounted solar arrays producing a combined output of around 134 MW or 360 to 380 GWh of electricity annually. Around 38 MW of battery storage would also be installed to store energy and so provide flexible balance of energy and the delivery of the full potential of renewable energy to meet the demands of the national grid.
 31 Oct 2019
 26 Jun 2023
 Refused
 172
 149.90
 19