 Development
 Wind Farm (Generating station of >100 <200 MW Capacity)
 Cloiche Wind Farm.
 Application
 ECU00002054
  Highland Council
 Andrew Curds
 Ash Design + Assessment Ltd
 21 Gordon Street, Glasgow, G1 3PL
 0141 2273388
 acurds@ashglasgow.com
 Alasdair Wilson
 SSE Generation
 Application amended to 29 Turbines in July 2022 The Proposed Development comprises a total of 36 turbines with a maximum tip height of 149.9 metres, and an installed capacity of over 150 megawatts, The wind farm would be located adjacent to the operational Stronelairg Wind Farm and Glendoe Hydroelectric Scheme, approximately 11 kilometres to the south east of Fort Augustus.
 28 Apr 2020
 149.90
 29