Wind Farm (Generating station of >100 <200 MW Capacity)
Application amended to 29 Turbines in July 2022
The Proposed Development comprises a total of 36 turbines with a maximum tip height of 149.9 metres, and an installed capacity of over 150 megawatts, The wind farm would be located adjacent to the operational Stronelairg Wind Farm and Glendoe Hydroelectric Scheme, approximately 11 kilometres to the south east of Fort Augustus.
28 Apr 2020