 We have received an application for a new connection to Allt Garaidh Ghulaich Hydro Scheme, Invergarry, Inverness-Shire, PH35 4HS. In order to provide the connection, we propose to erect a new pole (14) on the existing 33KV line in the vicinity. Pole 14 will be approximately 12 metres in height. From pole 14, we propose to erect three new span of overhead 33KV line, which comprises of two single intermediate poles (1 & 2) and one double (H) pole (3). This spur will be approximately 42 metres long. Poles 1 & 2 will be approximately 9.5 metres high and pole 3 will comprise of a double (H) pole consisting of two poles approximately 10 metres high. From terminal pole 3 we will underground approximately 1,260 metres of 33KV cable to (H) pole 4. From (H) pole 4 we will install a new single span of overhead 33KV line terminating at (H) pole 5. H poles 4 & 5 will comprise of two poles each, which will be approximately 10 meters in height. This span will be approximately 72 meters long.
 30 Apr 2020
 28 Jul 2020
 Consented
 114
 33
 12