Please Log in/Register to turn notification preferences on/off for this case.
 Scoping
 Wind Farm (Generating station of >100 <200 MW Capacity)
 Grayside Wind Farm
 Pre Application
 ECU00002131
 Rachel Taylor
 Arcus Consultancy Services -
 7th Floor, 144 West George Street, Glasgow, G2 2HG
 planning@arcusconsulting.co.uk
 Neal Reid
 Grayside WF Limited
 It is expected that the proposal will consist of up to 27 turbines with a maximum height to blade tip of up to 200 metres (m) and a total generating capacity of over 50 megawatts (MW). Ancillary infrastructure will also be required as part of the Development and may include a substation, external transformers, battery energy storage facility, new access tracks and site entrance, temporary construction compound, crane hardstandings and a permanent meteorological mast.
 24 Aug 2020