It is expected that the proposal will consist of up to 27 turbines with a maximum height to blade tip of up to 200 metres (m) and a total generating capacity of over 50 megawatts (MW). Ancillary infrastructure will also be required as part of the Development and may include a substation, external transformers, battery energy storage facility, new access tracks and site entrance, temporary construction compound, crane hardstandings and a permanent meteorological mast.
24 Aug 2020