The purpose of the application for variation of the 2018 Consent is to vary the Description of the Development to change the specification of the 39 turbines by increasing the maximum tip height from 135 m to up to 200 m and capacity from 133 MW to 208 MW and movement of substation location.
26 Aug 2020