Wind Farm (Generating station of >50 < 100 MW Capacity )
The proposed development comprises up to 16 wind turbines, of variable tip height with the maximum being up to 200 metres; an energy storage system (ESS) with up to 20MW capacity; a substation; and, associated access and infrastructure. The total generating capacity will be in excess of 50 MegaWatts (MW) and consent is sought for 35 years operation from the date of commissioning.
26 May 2023