Please Log in/Register to turn notification preferences on/off for this case.
 Development
 Wind Farm (Generating station of >100 <200 MW Capacity)
 Aultmore Wind Farm Redesign
 Consideration
 ECU00003365
  Moray Council; Aberdeenshire Council; Highland Council
 Alastair Smith
 SLR Consulting
 24 St Vincent Place, Glasgow, G1 2EU
 alastairsmith@slrconsulting.com
 Lucy Blake
 Vattenfall Wind Power Limited
 5th Floor , 70 St Mary Axe, London , United Kingdom , EC3A 8BE
 lucy.blake@vattenfall.com
  405.03640.00016
 A proposed wind farm development consisting of the construction and operation of up to 16 wind turbines (each rated at 6.6 megawatts (MW) with a maximum blade tip height of 200m) and associated infrastructure. The wind farm is expected to have a generating capacity of up to 105.6MW, with an additional Battery Energy Storage System (BESS) of up to 50MW. The proposed development is located approximately 6km north of Keith in Moray.
 28 Feb 2024
 155.60
 200
 16