 Development
 Wind Farm (Generating station of >100 <200 MW Capacity)
 Bloch Wind Farm
 Application
 ECU00003463
  Dumfries and Galloway Council
 Tim Doggett
 SLR Consulting
 Suite 223ab, 4 Redheugh Rigg, South Gyle , Edinburgh, EH12 9DQ
 +44 3300 886631
 tdoggett@slrconsulting.com
 James Cameron
 RES
 Third Floor, STV, Pacific Quay, Glasgow, G51 1PQ
 0788 124 4837
 jim.cameron@res-group.com
 The proposed development will comprise of a wind farm and battery energy storage system, comprising up to 21 three-bladed horizontal axis wind turbines with a maximum ground to blade tip height of 230 metres, with a total power output of approximately 126MW. The turbines would be nominally rated at 6MW. The battery energy storage system will be rated at approximately 45MW.
 02 Nov 2022
 126
 230
 21