Development
 Wind Farm (Generating station of >100 <200 MW Capacity)
 Bloch Wind Farm
 Consultation
 ECU00003463
 Dumfries and Galloway Council
 James Cameron
 RES
 Third Floor, STV, Pacific Quay, Glasgow, G51 1PQ
 0788 124 4837
 jim.cameron@res-group.com
 The Proposed Development involves the construction and operation of up to 18 wind turbines with maximum blade tip heights of up to 230 metres, alongside a battery energy storage system (BESS) and associated infrastructure. The total installed capacity is approximately 153MW, comprising 108MW from wind turbines (6MW each) and 45MW from battery storage. The proposed development is located within the Planning Authority area of Dumfries & Galloway Council, approximately 6km southwest of Langholm.
 02 Nov 2022
 126
 230
 21