The proposed development will comprise of a wind farm and battery energy storage system, comprising up to 21 three-bladed horizontal axis wind turbines with a maximum ground to blade tip height of 230 metres, with a total power output of approximately 126MW. The turbines would be nominally rated at 6MW. The battery energy storage system will be rated at approximately 45MW.
02 Nov 2022
126
21