Development
 Wind Farm (Generating station of >50 < 100 MW Capacity )
 Breackerie Wind Farm
 Application
 ECU00004507
 Argyll and Bute Council
 Craig Potter
 Energiekontor UK Ltd
 The proposed development involves the construction and 35-year operation of up to 13 wind turbines, each with a maximum blade tip height of up to 200 metres, alongside associated infrastructure. The total installed capacity is approximately 85.8MW from wind turbines, supported by an energy storage compound with a capacity of up to 5MW. The proposed development is located within the Planning Authority area of Argyll and Bute Council, approximately 8km south-west of Campbeltown.
 30 Oct 2023
 90.80
 200
 13