Wind Farm (Generating station of >100 <200 MW Capacity)
The Proposed Development involves the construction, 40-year operation, and decommissioning of up to 12 wind turbines, eight with tip heights of up to 230 metres and four up to 200 metres, alongside a Battery Energy Storage System (BESS) and associated infrastructure. The total installed capacity is approximately 171MW, comprising 86MW from wind turbines and 85MW from battery storage. The proposed development is located within the Planning Authority area of Moray Council, approximately 2 km north of Rothes.
09 Jul 2025