Development
 Hybrid
 Lees Hill Renewable Energy Park (LHREP)
 Referred to DPEA
 ECU00004571
 Scottish Borders Council
 Lesley Cartwright
 Natural Power
 The Green House, Forrest Estate, Dalry, Castle Douglas, Scotland , DG7 3XS
 lesleyc@naturalpower.com
 Emily Galloway
 Fred Olsen Renewables Ltd
 2nd Floor, 36 Broadway , London, SW1H 0BN
 The proposed development involves the construction and 35- year operation of up to 6 wind turbines, each with a maximum blade tip height of up to 200 metres, alongside a solar photovoltaic (PV) array with a generating capacity of up to 60MW and a Battery Energy Storage System (BESS) of up to 60MW. The total installed generating capacity is between 157MW and 165MW. The proposed development is located within the planning Authority area of Scottish Borders Council.
 16 Apr 2024