Development
 Wind Farm (Generating station of >50 < 100 MW Capacity )
 Glenvernoch Wind Farm
 Referred to DPEA
 ECU00004892
 Dumfries and Galloway Council
 George Oldroyd
 Energiekontor UK Ltd
 george.oldroyd@energiekontor.com
 A wind farm proposal comprising 13 turbines upto 200m at Glenvernoch. The installed capacity of the proposed generating station would be approximately 86 MW.
 12 Nov 2024
 86
 200
 13