Please Log in/Register to turn notification preferences on/off for this case.
 Development
 Hybrid Renewables (Other Generating Station)
 Allt an Tuir Renewable Energy Park
 Consultation
 ECU00005008
  Highland Council
 All Staff
 RSK Environment Ltd
 65 Sussex Street, Glasgow, G41 1DX
 rskenv@rsk.co.uk
 Sheenagh Mann
 Allt an Tuir Renewable Energy Park Limited
 Womble Bond Dickinson (UK), 2 Semple Street, Scotland, Edinburgh, EH3 8BL
 info@alltantuir.co.uk
 663657
 The Proposed Development involves the construction and operation of 9 wind turbines, 8 with tip heights of up to 200 metres and 1 up to 180 metres, alongside a solar photovoltaic array and a battery energy storage system (BESS). The total installed capacity is approximately 89.4MW, comprising 59.4MW from wind turbines (6.6MW each), 18MW from solar PV arrays, and 12MW from battery storage. The proposed development is located approximately 3km northwest of Rosehall.
 06 Feb 2025