Development
 Wind Farm (Generating station of >50 < 100 MW Capacity )
 Kellas Drum Wind Farm
 Consented
 ECU00005054
 Moray Council
 Gilbert Stevenson
 Kellas Drum Limited
 C/O Turcan Connell Princes Exchange, 1 Earl Grey Street, Edinburgh, EH3 9EE
 gilbert.stevenson@turnkeydev.com
 ECU00003441
 The Proposed Development involves the construction and operation of up to 8 wind turbines, each with a tip height of up to 149.9 metres, alongside a battery energy storage system (BESS) and associated infrastructure. The total installed capacity is approximately 68.4MW, comprising 38.4MW from wind turbines (4.8MW each) and 30MW from battery storage. The proposed development is located within the Planning Authority area of Moray Council, approximately 6km from Dallas in Moray.
 19 Mar 2024
 22 Jan 2026
 Consented
 85.20
 185
 8