 Wind Farm (Generating station of >50 < 100 MW Capacity )
 Balblair Wind Farm
 Consultation
 ECU00005055
  Highland Council
 All Staff
 RSK Environment Ltd
 65 Sussex Street, Glasgow, G41 1DX
 rskenv@rsk.co.uk
 Andrew Smith
 Wind Power North Two Limited
 50 Lothian Road, Festival Square, Edinburgh, EH3 9WJ
 andrewsmith@force9energy.com
 663896
 Application for construction and operation of a wind farm within The Highland Council Planning Authority area comprising of eight wind turbines, six having a maximum tip height of 180 m and two having a maximum tip height of 200 m, along with a combined installed capacity of up to 66 MW. Associated infrastructure including: - Foundations supporting each wind turbine. - A network of approximately 5064 km of on-site access tracks, including upgrades to existing tracks, new tracks, and associated watercourse crossings and drainage. - A network of underground cables to connect the turbines to a distribution substation. - Transformer/switchgear housings located adjacent to turbines. - Temporary wind farm construction compound areas, laydown areas and car parking. - Substation compound with a control building with closed-circuit television mast(s) and communication mast(s). - Battery Energy Storage System (BESS) facility of up to 30 MW capacity. - Borrow pit search areas. - Habitat and biodiversity enhancement measures. - Forestry works (if required). Ancillary development will include: - Health and Safety and other directional site signage - Aviation warning lighting to comply with Article 222 of the UK Air Navigation Order (ANO 2016)
 14 Mar 2025
 66
 200
 8