Please Log in/Register to turn notification preferences on/off for this case.
 Development
 Wind Farm (Generating station of >50 < 100 MW Capacity )
 Balblair Wind Farm
 Consultation
 ECU00005055
  Highland Council
 Spyridonas Angeli
 RSK Environment Ltd
 65 Sussex Street, Glasgow, G41 1DX
 sangeli@rsk.co.uk
 Andrew Smith
 Wind Power North Two Limited
 andrewsmith@force9energy.com
 663896
 The proposed Development will comprise up to nine wind turbines with maximum 200 m blade tip height. Associated infrastructure will include: a means of access from the public road to the Site turbine foundations crane hard standings transformer/switchgear housings located adjacent to turbines internal access tracks (use of existing, upgrade of existing or new as required), watercourse crossings (upgrade of existing or new as required) and associated drainage underground electrical cabling permanent anemometer mast or LiDAR compound temporary wind farm construction compound area, laydown areas and car parking substation compound with a control building with closed-circuit television mast(s) and communication mast(s) energy (battery) storage borrow pit search areas forestry works (if required). Ancillary development will include: Health and Safety and other directional site signage aviation warning lighting to comply with Article 222 of the UK Air Navigation Order (ANO 2016) proposals for habitat management and enhancements.
 14 Mar 2025
 200
 8