Wind Farm (Generating station of >50 < 100 MW Capacity )
The proposed development comprises the construction, 40-year operation and decommissioning of up to 13 wind turbines with maximum blade tip heights of up to 180m, together with associated infrastructure. The development also includes a Battery Energy Storage System (BESS) with a rated capacity of approximately 22MW. The site is located within the highland Council area, approximately 2.8km south-west of Tomatin and north of Kyllachy House, with the overall generating capacity exceeding 50MW.
05 Sep 2025