Development
 Wind Farm (Generating station of >50 < 100 MW Capacity )
 North Logiealmond Wind Farm
 Consultation
 ECU00006004
 Perth and Kinross Council
 Andrew Marshall
 Muirhall Energy Ltd
 Muirhall Farm, Carnwath, ML11 8LL
 andrew.marshall@muirhallenergy.co.uk
 13 turbines, six turbines with a maximum 180 m tip height and seven turbines with a maximum 200 m tip height. With an installed capacity of up to 93.6 MW, and associated infrastructure. The proposed operational lifetime is 50 years.
 15 Sep 2026
 93.60
 200
 13