Wind Farm (Generating station of >50 < 100 MW Capacity )
North Logiealmond Wind Farm
ECU00006004
Perth and Kinross Council
Andrew Marshall
Muirhall Energy Ltd
Muirhall Farm, Carnwath, ML11 8LL
andrew.marshall@muirhallenergy.co.uk
13 turbines, six turbines with a maximum 180 m tip height and seven turbines with a maximum
200 m tip height. With an installed capacity of up to 93.6 MW, and associated infrastructure. The proposed operational lifetime is 50 years.
15 Sep 2026
93.60
13