Development
 Overhead Power Line (Non-EIA)
 Netherton Hub 400kV OHL Connection to New Deer and Peterhead: Tie-In
 Consultation
 ECU00006167
 Aberdeenshire Council
 Gavin Evans
 Scottish Hydro Electric Transmission Plc
 10 Henderson Road, Inverness, IV1 1SN
 07721425281
 gavin.evans@sse.com
 LT650
 A permanent diversion of the existing New Deer to Peterhead 400 kV OHL into a new 400 kV substation, proposed as part of the Netherton Hub, and removal of the associated length of the existing OHL. The development also includes installation of a temporary OHL circuit to facilitate the transfer of the connection between the existing OHL and Netherton Hub.
 05 May 2025
 23 Jul 2025
 Non-EIA
 5300
 400kV