Scoping
 Wind Farm (Generating station of >100 <200 MW Capacity)
 Auchinoon Energy Park
 Pre Application Complete
 ECU00006339
 Michael Fenny
 SLR Consulting
 The Tun, 4 Jacksons Entry, Edinburgh, EH8 8PJ
 mfenny@slrconsulting.com
 Kevin Lawlor
 Eurowind Energy Limited
 58 Morrison Street, Edinburgh, EH3 9PB
 07493 410443
 kel@eurowindenergy.com
 It is currently anticipated that the proposed development would consist of up to eight wind turbines with a tip height of up to 200m and a solar PV array covering approximately 60ha. It is also currently proposed to include a battery energy storage system (within the substation compound) for load shifting i.e. not for grid export.
 19 Aug 2026
 19 Aug 2026