Development
 Overhead Power Line (Non-EIA)
 SP94413 Armadale Rebuild
 Consented
 ECU00006360
 West Lothian Council
 Rhona Sharp
 Bell Ingram
 Durn, Isla Road, PERTH, PERTH, Tayside, PH2 7HF
 01738 621121
 rhona.sharp@bellingram.co.uk
 Hollie Hodge
 SP Distribution PLC
 320 St. Vincent Street, Glasgow, Glasgow, G2 5AD
 01292886544
 Hollie.Hodge@bellingram.co.uk
 Armadale SP94413
 The application relates to the Scottish Power Distribution SP94413 Armadale 11kV Overhead Line circuit re-build. The line is located north of Armadale and Bathgate in West Lothian and is 8.4km in length including spurs, 3.9km of which is being submitted under S37, with the tallest pole being 13m in height. The circuit re-build includes diverting sections of the existing line as outlined in the attached route maps (red = proposed and grey = existing). The sections of line deviation amount to approximately 3.9km and represent areas being submitted under S37. The entire line Deviation points are as follows: Point A Grid Ref. NS953687 - NS946697 Point B Grid Ref. NS940699 - NS938700 Point C Grid Ref. NS945716 - NS952723 Point D Grid Ref. NS957700 - NS962694 Point E Grid Ref. NS952706 - NS955703 The work requires removal of various trees. All affected landowners have been consulted and have agreed to the works as well as replanting works where agreed by the landowner. The access arrangements will be discussed and agreed with the landowners prior to any work commencing.
 15 Apr 2026
 22 Jul 2026
 Consented
 3900
 11kV