Screening
 Overhead Power Line (Non-EIA)
 new 33kV tee off Glenkiln Farm, Isle of Arran
 Pre Application
 ECU00006370
 North Ayrshire Council
 Grace Brown
 Scottish Hydro Electric Power Distribution PLC
 Inveralmond House, 200 Dunkeld Road, Perth, Perthshire, PH1 3AQ
 grace.brown@sse.com
 FFE 549
 The Project comprises of the construction of a new 33kV overhead line to provide both a new supply & export of electricity to a new solar facility at Glenkiln Farm. The new 33kV overhead line will tee off from a new pole on the Arran North cable circuit. The overhead line will consist of 16 single poles, 1 double pole and 16 span of 33kV conductor. The total length of the overhead line will be 1191m. The poles will house our plant equipment and a number of these will also have stay wires attached. The poles will range between 9m & 13m in height.
 27 Jul 2026
 1191
 33
 13