Overhead Power Line (EIA)
DWNO Reinforcement Project - Uprating of ZG Overhead Line from 275kV to 400kV and ancillary works
ECU00006375
Falkirk Council
Alan Graham
SP Transmission Plc
Land and Planning, 55 Fullarton Drive, Glasgow, G32 8FA
07552266171
a.graham@spenergynetworks.co.uk
ECU00006196
The application proposes the uprating of existing overhead line (OHL) ZG route from 275kV to 400kV, which runs between Denny North substation and Bonnybridge substation. The uprating shall comprise replacement of existing conductors (overhead line wires), downleads, temporary accesses, tower foundation upgrades and tower strengthening.
12 Jun 2026
4000
Proposed uprating from 275kV to 400kV
54.97