Development
 Overhead Power Line (EIA)
 DWNO Reinforcement Project - Uprating of ZG Overhead Line from 275kV to 400kV and ancillary works
 Consultation
 ECU00006375
 Falkirk Council
 Alan Graham
 SP Transmission Plc
 Land and Planning, 55 Fullarton Drive, Glasgow, G32 8FA
 07552266171
 a.graham@spenergynetworks.co.uk
 ECU00006196
 The application proposes the uprating of existing overhead line (OHL) ZG route from 275kV to 400kV, which runs between Denny North substation and Bonnybridge substation. The uprating shall comprise replacement of existing conductors (overhead line wires), downleads, temporary accesses, tower foundation upgrades and tower strengthening.
 12 Jun 2026
 4000
 Proposed uprating from 275kV to 400kV
 54.97