Screening
 Overhead Power Line (Non-EIA)
 Transmission DNO connections (Crarae Substations)
 Complete
 ECU00006381
 Argyll and Bute Council
 Claire Purdie
 Scottish Hydro Electric Power Distribution PLC
 Inveralmond House, 200 Dunkeld Road, Perth, Perthshire, PH1 3AQ
 07443173795
 Claire.Purdie@sse.com
 PJEWD831
 We propose to upgrade a current and add a new overhead line spur to provide an electricity connection to two transmission substation sites. This will consist of 20 new single poles, 4 new H poles and the removal of 6 single poles and 2 H poles. The total length of this line will be 2250m. From current pole number 1033, we propose to install 2250m of 33kV overhead cable. For information, the line will move to underground cable from the final pole in each section to meet the new development.
 14 Apr 2026
 09 Jul 2026
 Non-EIA
 2250
 33
 13