Overhead Power Line (Non-EIA)
Salamander Offshore Wind Farm Connection
New 132kV transmission connection, comprising:
1. approximately 900 m of 132 kV double circuit overhead line (OHL) supported on steel lattice towers,
2. approximately 600 m of 132 kV double circuit underground cable (UGC),
3. a cable sealing end compound at the transition between the OHL and UGC; and
4. a tee-in substation compound allowing for the connection of the proposed OHL into the existing Peterhead to St Fergus transmission network OHL.
06 May 2026