Scoping
 Overhead Power Line (EIA)
 Redshaw to Hagshaw Tee to Bankend Rig III Substation Overhead Line Grid Connection
 Pre Application Complete
 ECU00006437
 South Lanarkshire Council
 Louise McCulloch
 SP Transmission Plc
 Land and Planning, 55 Fullarton Drive, Glasgow, G32 8FA
 lmcculloch@spenergynetworks.co.uk
 A new 132kV single circuit overhead line (OHL), approximately 36km in length with approximately 1.72km of underground cable (UGC) to run from Redshaw Substation to the proposed Bankend Rig III substation via the provision of a connection to Hagshaw Hill Repowering Phase 3 substation
 29 Jun 2026
 05 Oct 2026
 36000
 132
 15